Acoustics
Technology and history
Competences
Wanner Technical Insulation, with more than 70 years of professional activity, offers broad experience and the greatest guarantees, in the development of all the phases of the project: analysis of noise and original cause, solutions design & development, fabrication, assembly, and final certification.

Action lines
ENAC ACCREDITATION
The acoustic testing laboratory has been granted by ENAC with accreditation LE/1817 for the activities included in the technical annex in force.
NOTE: The laboratory maintains a controlled and public list of the Normative Documents that it has analysed and for which it has concluded that it has the adequate technical capacity.
Category I
(On-site testing)
Product/ Material to Test |
Test | Standard/ Test Procedure |
---|---|---|
Environmental Noise | Spatial and temporal sampling
Measurement of ambient noise levels of activities and acoustic quality objectives |
Annex IV of Royal Decree 1367/2007 of the 19th of October |
Buildings and construction elements | Spatial and temporal sampling
Vibration measurement |
Annex IV of Royal Decree 1367/2007 of the 19th of October |
SOME KEY
PROJECTS
Environmental & noise surveys
- Axion Energy Campana Refinery (AR) /
- Repsol YPF’s methanol plant in Neuquen (AR) /
- New coke unit at Repsol’s plant in Puerto la Plata (AR) /
- ENDESA’s diesel power plants in Baleares: Ibiza & Mahon /
- ENDESA’s diesel power plant in Melilla (ES) /
- UNELCO’s (Endesa) thermal power plant in Canarias (ES): Granadilla, Candelaria, Barranco de Tirajana, and Jinámar /
- UNELCO’s (Endesa) diesel power plants in Canary Islands (ES): Los Guinchos, Las Salinas, Punta Grande, Llanos Blancos, and El Palmar /
- UNELCO’s (Endesa) TG in Canary Islands (ES): Arona and Guia de Isora /
- Lafarge-Asland plant at Sagunto Port and Moncada (ES) /
- Marismas 3 Fenosa’s natural gas plant in Huelva (ES) /
- ENCE’s cellulose plant in Navia – Asturias (ES) /
Soundproofing
- Soundproofing of blowers, ventilators, and compressors at Nestlé’s La Penilla plant (ES) /
- Turbine soundproofing in Unelco’s thermal power plant in Candelaria (ES) /
- Soundproofing at Endesa’s water treatment plant in Mahon (ES) /
- Soundproofing of compressor at DuPont Asturias (ES) /
- Soundproofing of compressors at the Solvay plant, in Martorell (ES) /
- Soundproofing of sonic horns for TSK at EDP’s Aboño and Soto de Ribera thermal power plants (ES) /
Noise barriers
- Soundproofing of turbines at Edegel’s Santa Rosa power plant (PE) /
- Soundproofing of turbines at Endesa’s diesel power plant in Ibiza (ES) /
- Central roof and bottling buildings at Damm’s plant in El Prat de Llobregat (ES) /
- Soundproofing in TG1 offices of Unelco’s diesel power plant in Salinas (ES) /
- Soundproofing in the Barranco Tirajana thermal power plant in Gran Canaria (ES) /
Acoustic conditioning
- Madrid-Adolfo Suárez Airport Terminal T4 Madrid (ES) /
- Booking’s new headquarters in Barcelona (ES) /
- Desigual’s new headquarters in Barcelona (ES)
Customers